Ontario Fire District #1 Station #3 Addition & Renovations

Construction of the Ontario Fire District #1 Station #3 addition and renovation project. The renovation of the existing building (approximately 2,323 SF office area and 2,220 SF storage area) shall include new doors, windows, vinyl siding, asphalt shingle roofing, kitchen, restrooms, multi-purpose room, interior finishes and selective demolition. The building addition will be a masonry load-bearing structure housing two new apparatus bays (approximately 2,340 SF) and shall include: new foundation walls on concrete spread footers, concrete masonry block walls, insulated overhead garage doors, insulated concrete slab, radiant floor system, roof trusses, asphalt shingle roofing and hollow metal doors and frames. Site improvements will include asphalt drive areas, concrete walks/pads, grading, oil-water separator, sub-surface utilities, and stormwater structures. This project will be performed under Wick’s Law and will require a total of four (4) prime contracts. General Construction shall include site, architectural and structural scope of work. Other primes will include Electrical, Plumbing and Mechanical (HVAC) Construction.

Status

Bidding Closed

Prebid Date1/28/21 2:00 pm

Bid Date2/16/21 2:00 pm

Company & Contacts

MRB Group

Brian Grinnell   5853819250

Location

6714 Lakeside Road, Ontario, NY 14519

This job requires a non-refundable deposit made payable to Avalon. An electronic download is available made payable to Avalon.

Full Purchase Only