Town of Farmington Wastewater Treatment Plant Primary Digester #1 Cleaning 2021

The project consists of the removal of sludge, rags, debris, rainwater, etc. in Primary Digester #1. The Contractor shall provide means and labor to achieve this. The Contractor will need to perform their own testing on the sludge to determine appropriate disposal methods. After removal of digester contents, the Contractor shall also pressure wash the interior of the digester and provide a means to remove all washwater as well.

Status

Bidding Closed

Prebid Date12/7/21 1:00pm

Bid Date12/21/21 2:00pm

Company & Contacts

MRB Group

Mark Bailey mark.bailey@mrbgroup.com   5853819250

Location

1216 McMahon Road, Victor, NY, 14564

This job requires a nonrefundable fee made payable to Avalon.

An electronic download of the plans/specs are available made payable to Avalon.