Sturgeon Point Shoreline Protection

Stabilize an eroding shoreline over 490 feet, with all proposed work located above the Ordinary High Water Mark. The work will include slope regrading, placement of a concrete toe and rip-rap revetment. The site will be restored with native vegetation after the slope revetment is constructed.
00 Full Set Plans (click to expand/collapse)
Name Size
39785-1_OUTPUT_Drawings 13.5 MB