Gorham Highway Garage Roof Replacement
The project will include the complete removal of the existing EPDM roofing system, approximately 7,580 sf, partial insulation replacement, followed by installation of a new EPDM roofing system. The scope of work also includes removal and replacement of the building’s gutters and downspouts. This project will be performed under a single contract. General Construction shall include all scope of work.
Plan Holders
Date | Company | Contact |
10/8/25 5:01 pm |
Avalon
89 Allen Street
Rochester, NY 14608 |
Rochester Service
Tel: 585-242-9999
Fax: 585-242-9994
|
10/8/25 5:01 pm | Builders Exchange |
Nicole G
Tel: 585-586-5460
|
10/10/25 12:49 pm |
ConstructConnect
30 Technology parkway South, Suite 100
Norcross, GA 30092 |
Construct Connect
Tel: 3026025079
Fax: 3026025079
|
10/8/25 5:01 pm |
Dodge Data
830 3rd Avenue, 6th floor
New York, NY 10022 |
Darlene Baker-Mann
Tel: 413.548.8188 x 9246
|
10/8/25 5:01 pm | MRB Group |
Cassidy Roelofs
|
10/10/25 9:22 am |
PlanHub
1665 Palm Beach Lakes Blvd
West Palm Beach, FL, FL 33401 |
Project Coordinator
Tel: (561) 656-4701
|
10/11/25 7:44 am |
Spring Sheet Metal & Roofing, LLC.
678 Clinton Ave. South
Rochester, NY 14620 |
Eric R. Warren
Tel: 5852447730
|