Town of Richmond, Route 20A Sidewalk
The project consists of the construction of sidewalks along NYS Route 20A in the Town of Richmond. Sidewalks are to be constructed along the north and south side of NYS Route 20A, from the Honeoye Creek bridge to Church Street (±1,700). Construction of crosswalks across NYS Route 20A and County Road 36 include crosswalk traffic signaling. Work will also include replacement of curbing, asphalt restoration, lawn restoration, removal of old sidewalk and maintenance and protection of traffic within the Town of Richmond.
Addendum 01
(click to expand/collapse)

Name | Size | ||
Richmond Sidewalk ADDENDUM NO. 1 | 2.9 MB |
Bid Tabulation
(click to expand/collapse)

Name | Size | ||
1812.21001 T. Richmond 20 A Sidewalk | 29.9 KB |
Pre-Bid Meeting Minutes/Sign In
(click to expand/collapse)

Name | Size | ||
Richmond Pre-Bid Mintues - 3-10-23 | 28.7 KB | ||
Richmond Pre- Bid Sign in 3-10-23 | 57.3 KB |