Town of Richmond, Route 20A Sidewalk
The project consists of the construction of sidewalks along NYS Route 20A in the Town of Richmond. Sidewalks are to be constructed along the north and south side of NYS Route 20A, from the Honeoye Creek bridge to Church Street (±1,700). Construction of crosswalks across NYS Route 20A and County Road 36 include crosswalk traffic signaling. Work will also include replacement of curbing, asphalt restoration, lawn restoration, removal of old sidewalk and maintenance and protection of traffic within the Town of Richmond.
Status
Bidding Closed
Prebid Date | 3/9/23 1:00pm |
Bid Date | 3/16/23 1:00pm |
Company & Contacts
MRB Group
Jonathan Hinman, P.E.
585-381-9250
Location
Route 20A, Town of Richmond, New York 14471
This job requires a nonrefundable fee made payable to Avalon.
An electronic download is available made payable to Avalon.